|
Part 1: Putting it all Together
by Fred Eady
Start ý Overview
ý Elmerýs Silicon Glue ý Time
to Kill ý The CS8900A-CQ ý Software
and Firmware ý ICSP and LVP ý Assemble
the Ethernet Electronics ý No Floating
Allowed ý Installing the Bypass Capacitors
ý Pin Point ý Finishing
Installation ý Assemble the PIC16F877
Electronics ý The Rest of the Project
ý Winding Down ý Finishing
Up ý Sources and PDF
FINISHING INSTALLATION
Use Photo 6 to complete the LED, resistor,
capacitor, crystal, voltage regulator, and magnetic installations.
Pay special attention to the LED installation detail in Photo 7. Also
note that the isolation transformer has a pin 1 designator that you
should match with the pin 1 dot on the transformerýs printed circuit
board pads. If you follow what you see in the photos, everything will
fall into place correctly.
|
|
| Photo 6ýThe lines pointing
to the red and green LEDs denote what is normally the cathode
of the devices. On the red LED, the marker denotes the anode.
Go figure. |
|
|
| Photo 7ýHereýs a closer shot
where you can see the markers. |
PREVIOUS
NEXT
Circuit Cellar provides up-to-date information for engineers. Visit
www.circuitcellar.com for
more information and additional articles.
For subscription information, call (860) 875-2199, subscribe@circuitcellar.com
or subscribe online.
ýCircuit Cellar, the Magazine for Computer Applications. Posted with
permission. |